Company Experience Services Publications and Affiliations Contact Home


HBC International, through fifteen years working with Kennecott Utah Copper (KUC) has significantly contributed to the unique combination of proactive environmental clean-up and remediation development. The implementation and maturing of this approach allowed KUC to successfully avoid Superfund listing through cost-effective and innovative management.

Back to Experience summary

WATER TREATMENT SERVICES AND PROJECTS
Reverse Osmosis Plant - Kennecott Utah Copper; Bingham Canyon, Utah
Services: Process Analysis and Development, Bench and Pilot Testing, Engineering and Design, Construction Management and Operation of the 3 Phase Project.

HBC International conducted the pilot testing, design, construction, operation and maintenance of Kennecott Utah Copper's reverse osmosis demonstration plant. A full-scale plant is currently under construction in a three phase approach with the completion scheduled for the end of 2005. Upon completion, the plant will provide treatment of 3.5 MGD of contaminated groundwater.


The HBC International team is providing project management and expertise across all areas of the project from concept through construction and operation.

 

Membrane Filtration Plant - Kennecott Utah Copper; Bingham Canyon, Utah
Services: Process Development and Optimization, Solution Evaluation and Pilot Testing, Plant Management, Safety Coordination, and Operations.

The Membrane Filtration project encompassed evaluation and pilot testing of water treatment technologies, as well as engineering and construction of systems to treat various waters. HBC International executed and managed project components including the following:
  • Nano-filtration: pilot testing, design, construction, operation and maintenance of systems to treat leach water and acid plume water (3 MGD).
  • Evaluation of disposal options for membrane filtration concentrates.
  • Pilot testing of RO filtration for selenium contaminated groundwater.
  • Evaluation of special filtration systems (e.g. VSEP, ROCHEM).


Biological Sulfate Reduction
- Kennecott Utah Copper; Bingham Canyon, Utah
Services: Project Management, Process Analysis, Plant Operation, Process evaluation and Optimization.

Operation of pilot plant in cooperation with the Dutch company Paques. The project was a three year effort that included water treatment and H2S production applications.
Passive water treatment in wetlands was also evaluated.


Biological Selenate Reduction - California State University, Fresno
Services: Project Management.
Bench-scale reactor test of biological selenate reduction to elemental selenium under anoxic conditions in the presence of an organic carbon source. Selenium reductions of >99% were achieved.

 

Chemical Water Treatment
Services: Project Management, Process Analysis, Bench and Pilot testing.

  • Pilot testing of lime treatment.
  • Determination of water quality influence on lime slaking efficiency.
  • Bench and pilot scale development of selective precipitation of alumina (production of catalyst grade alumina).
  • Evaluation of settle-ability and filtering behavior of chemical water treatment precipitates.
  • Evaluation of alunite precipitation process.
  Copyright HBC International